Skip to main content
Tampere's climate and environmental watch
Climate
LUMO
Tampereen luonnon monimuotoisuusohjelma
en
Suomi
English
Home
Theme
Climate leadership and stakeholder collaboration
Sustainable urban planning
Sustainable mobility
Sustainable construction
Sustainable energy
Sustainable consumption
Sustainable urban nature
All measures
Indicators
Information about the service
Search
en
Suomi
English
2024
All versions
2024
2022
Emission scenarios
Loading...
Loading...
Loading...
Loading
All measures
Filter
Theme
Mitigation, adaptation and circular
economy
Definition
Organization
Definition
Phase
Definition
Show only continuous actions
Search actions
Search
397 actions
List
Dashboard
No results for this search. Try changing the search terms.
0.
Climate leadership and stakeholder collaboration
0.1.1
Implementation (On time)
The city’s units and companies will be supported in climate change mitigation and adaptation work
0.1.2
Implementation (On time)
Cooperation networks
0.1.3
Implementation (On time)
New financing opportunities and coordination of project applications
0.1.4
Communicating the goals and measures of the roadmap
0.1.5
Implementation (On time)
Residents’ participation and opportunities to influence things in the themes of climate change mitigation and adaptation…
0.1.6
Implementation (On time)
The Strategy Unit will support roadmap implementation and monitoring as part of the city’s strategic management system
0.1.7
Implementation (On time)
The city’s Project Office will support project managers in taking climate impacts into account as part of comprehensive …
0.1.8
Planning (On time)
Strengthening the cooperation of the city’s climate and welfare management
0.1.9
Implementation (On time)
Developing staff competence in climate goals
0.1.10
Planning (On time)
A plan will be established to offset the emissions that cannot be reduced by 2030
0.1.11
Implementation (On time)
Climate emissions from the city’s air travel will be offset and monitored
0.1.12
Continuous
A climate change adaptation operating model is prepared in 2022
0.1.13
Preparedness communications to residents
0.1.14
Preparedness communications to operating units
0.2.1
Implementation (On time)
The impact of the climate budget on financial planning processes will be developed
0.2.2
Implementation (On time)
The emission scenario tool used by the city will be developed
0.2.3
Implementation (On time)
Ecosystem services and ecosystem accounting
0.2.4
Review of the reflective effects
0.2.5
Not started
Opportunities will be explored to assess the climate effects of the city’s road transport projects
0.2.6
Implementation (On time)
CO2 emissions from the building stock
0.3.1
Continuous
Climate Partnership
0.3.2
Not started
Corporate cooperation
0.3.3
Implementation (On time)
New major investments will be attracted to the region, with an emphasis on different investments supporting the green tr…
0.3.4
Implementation (On time)
Climate-business corporate ecosystems will be developed in the Tampere region
0.3.5
Implementation (On time)
Low-carbon products and services of SMEs
0.3.6
Implementation (On time)
Utilising and enabling green financing
0.3.7
Implementation (On time)
Responsibility of the city’s investment activities
0.3.8
Implementation (On time)
The development of the responsibility work and responsibility reporting of the subsidiaries will be continued
0.3.9
Implementation (On time)
Tarastejärvi recycling park
0.3.10
Implementation (On time)
Kolmenkulman Eco-Industrial Park
0.4.1
Planning (On time)
Communications and market dialogue on the environmental objectives of procurement
0.4.2
Implementation (On time)
Use of environmental criteria in procurement
0.4.3
Continuous
Developing procurement competence
0.4.4
Continuous
Cooperation in sustainable procurement
0.4.5
Planning (On time)
Environmental objectives of procurement categories
0.4.6
Implementation (On time)
Environmental issues and energy efficiency will be addressed as part of the cloud transition of ICT services
0.4.7
Implementation (On time)
Sustainable infrastructure service and information system procurements
0.4.8
Implementation (On time)
Sustainable ICT equipment procurement
0.4.9
Completed
Taking climate neutrality into account in procurements in Tampere Water
0.4.10
Completed
Procurements of schools and day-care centres
1.
Sustainable urban planning
1.1.1
Completed
Assessment of the climate impact of the urban structure
1.1.2
Completed
Energy efficiency of the urban structure
1.1.3
Implementation (On time)
Development of the assessment of the climate impact of the urban structure
1.1.4
Assessment of the climate impact of the city plan
1.1.5
Implementation (On time)
Surveying areas on the deck and setting indicators for them
1.1.6
Implementation (On time)
Maintenance and development of operating environment information
1.1.7
Solutions related to adaptation to climate change in local detailed plans
1.1.8
Continuous
Climate change adaptation in the urban structure
1.1.9
Implementation (On time)
Impact analysis of city centre development projects
1.1.10
Planning (On time)
Carbon footprint calculations of urban development projects
1.1.11
Completed
Energy modelling will be carried out for the Tammela complementary construction area
1.1.12
Planning (On time)
Enhancing information flow for project development
1.1.13
Implementation (On time)
Environmental classification of the Hiedanranta master plan
1.1.14
Planning (On time)
Utilisation of zero fibre
1.1.15
Implementation (On time)
Implementation of the city centre’s development programme in accordance with the objectives
1.2.1
Implementation (On time)
Land use policies
1.2.2
Planning (On time)
Guiding the local detailed planning
1.2.3
Continuous
Sustainable procurement in detailed planning and transport planning
1.2.4
Implementation (On time)
Tendering processes for contracts implemented by Strategic Project Development will use the absolute requirements relate…
1.2.5
Continuous
Advancing wood construction in the detailed plan
1.2.6
Completed
Instructions for wood construction
1.2.7
Planning (On time)
Detailed plan regulations related to climate change adaptation are developed
1.2.8
Planning (On time)
Tampere station and deck area
1.2.9
Planning (On time)
Sustainable solutions of Hakametsä Sport Campus
1.2.10
Planning (On time)
Carbon footprint of residential construction
1.2.11
Completed
Marketing of complementary construction sites in the city centre
1.2.12
Implementation (On time)
Sustainable design competitions
1.2.13
Implementation (On time)
Space reservations for adaptation structures
1.2.14
Completed
Snow space guidelines
1.2.15
Utilisation of local collection areas in snow management
1.2.16
Completed
Construction of Hiedanranta, common facilities and communality
1.2.17
Detailed plan regulations to promote circular economy are being developed
1.3.1
Implementation (On time)
Planning in zones of sustainable growth
1.3.2
Implementation (On time)
Sustainable mobility in new and urban densification areas
1.3.3
Continuous
Accessibility of services through sustainable modes of mobility
1.3.4
Implementation (On time)
Accessibility of local services
1.3.5
Completed
Commuter train stations in land use planning
1.3.6
Implementation (On time)
Walking, cycling and public transport in the local detailed plan
1.3.7
Implementation (On time)
Implementation of canopy coverage of indicative recreation connections
1.3.8
Climate change adaptation in transport system planning
1.3.9
Completed
Sustainable Transport System of Hiedanranta
1.3.10
Planning (On time)
Optimisation of accessibility in Viinikanlahti’s
1.3.11
Implementation (On time)
Concentrated parking buildings in Viinikanlahti
1.3.12
Planning (On time)
Development of railway station area
1.3.13
Completed
Digital urban space manual
1.3.14
Planning (On time)
High-speed Tampere–Helsinki railway connection
1.3.15
Planning (On time)
Improving local tourism
1.3.16
Implementation (On time)
Development of event conditions in the city centre and promotion of sustainable tourism
1.3.17
Not started (Late)
The accessibility of walking and cycling in Särkänniemi will be improved with a new ticket office and entrance gate
1.4.1
Continuous
Cohesion of green areas
1.4.2
Continuous
A green factor will be introduced into and used in the appropriate detailed plans
1.4.3
Planning (On time)
Increasing and development of blue-green infrastructure in city green development areas
1.4.4
Implementation (On time)
Participation in the development of the blue-green infrastructure planning tool and its introduction
1.4.5
Planning (On time)
Defining the principles of securing the blue-green infrastructure in the growth and vitality zone
1.4.6
Planning (On time)
Yard and garden plans in detailed plans concerning vulnerable people
1.4.7
Planning (On time)
Landscaping in development projects of the city centre
1.4.8
Planning (On time)
Green roofs in urban development projects of the city centre
2.
Sustainable mobility
2.1.1
Completed
First tramway section
2.1.2
Completed
Tramway traffic Koskipuisto–Sorin aukio
2.1.3
Completed
Second tramway section
2.1.4
Completed
A regional master plan for the tramway will be drawn up (Kangasala, Pirkkala, Ylöjärvi)
2.1.5
Completed
Plan for the Tampere and Pirkkala tramway
2.1.6
Completed
Scheduling of other tramway lines
2.1.7
Implementation (On time)
Increasing the passenger volume of public transport
2.1.8
Completed
Green electricity for tram traffic
2.1.9
Completed
Tramway introduction campaign
2.1.10
Implementation (On time)
Third tramway section
2.1.11
Planning (On time)
Fourth tramway section
2.2.1
Completed
Pilot for commuter train traffic
2.2.2
Completed
The Tesoma commuter train stop will be built
2.2.3
Implementation
Participation in the planning and financing of commuter train traffic services
2.2.4
Completed
Regional plan for commuter train traffic
2.2.5
Completed
Common ticketing products for bus and train services will be developed
2.3.1
Completed
Development of bus traffic tendering models
2.3.2
Completed
Climate goals for TKL production agreement
2.3.3
Completed
Low-emission bus traffic
2.3.4
Planning (On time)
New bus depot
2.3.5
Completed
Route planning of electric buses
2.3.6
Planning
Electric buses
2.3.7
Planning (On time)
Development of autonomous transport
2.4.1
Continuous
Adequate headways for public transport
2.4.2
Not started (On time)
Speeding up travel times for public transport
2.4.3
Not started
Expansion of public transport trunk lines
2.4.4
Continuous
Development of public transport quality
2.4.5
Continuous
Development of public transport ticket system
2.4.6
Completed
New payment methods for public transport
2.4.7
Implementation (On time)
Open transport data
2.4.8
Planning (On time)
Streamlining public transport hubs
2.5.1
Completed
Programmes of pedestrian and bicycle traffic
2.5.2
Implementation (On time)
Pedestrian-oriented development of city centre and regional centres
2.5.3
Implementation (On time)
Improvement of main walking and cycling routes
2.5.4
Planning (On time)
Bicycle parking garages
2.5.5
Implementation (On time)
Increasing the number of bicycle parking spaces in public areas
2.5.6
Implementation (On time)
Bicycle parking at service properties
2.5.7
Planning (On time)
Development of bicycle parking spaces at the city’s properties
2.5.8
Planning (On time)
Winter maintenance of cycling and walking routes
2.5.9
Development of city bike system
2.6.1
Planning (On time)
Electric car charging network
2.6.2
Implementation (On time)
Electric car charging stations in the city’s new construction and renovation projects
2.6.3
Planning
Developing a parking policy
2.6.4
Planning (On time)
Space freed up for sustainable modes of transport
2.6.5
Planning (Late)
Concept of Smart Parking
2.6.6
Development of park-and-ride
2.6.7
Implementation (On time)
Promoting sustainable mobility and logistics services
2.6.8
Diverse and innovative travel chain services
2.6.9
Implementation (On time)
Car-sharing services
2.6.10
Not started
City-centre low-emission zone
2.6.11
Not started
Congestion charges
2.6.12
Increasing the distribution of transport biogas
2.6.13
Planning (On time)
Procurement plan for cars owned by the city
2.6.14
Implementation (On time)
Use of fully electric cars in subsidiaries
2.6.15
Planning (Cancelled or postponed)
Green Parking – promoter of travel chains
2.6.16
Implementation (On time)
Increasing the number of charging stations for electric cars
2.7.1
Delivery traffic arrangements
2.7.2
Allowing the stopping of delivery trucks in areas where parking and stopping is prohibited
2.7.3
Parking ID for delivery traffic will be adopted
2.7.4
Establishing cooperation group for city logistics
2.7.5
Coordination of land use and logistics
2.7.6
Benefits of low-emission delivery vehicles
2.7.7
Business models for delivery traffic charging stations
2.7.8
Implementation (On time)
Making Voimia’s logistics more environmentally friendly
2.7.9
Completed
Improving the efficiency of freight and passenger logistics
2.8.1
Planning (On time)
Launching of low-emission waterbus transport
2.8.2
Implementation (On time)
Development of ports
2.8.3
Not started
Port charging points and availability of biofuels
2.8.4
Not started
The number of waste collection points will be increased at ports while improving waste sorting at ports
2.9.1
Completed
Sustainable urban mobility plan
2.9.2
Implementation (On time)
Action plan for mobility management
2.9.3
Implementation (On time)
Traffic congestion and mobility management
2.9.4
Continuous
Management of disturbances in public transport
2.9.5
Planning (On time)
Promotion of public transport in culture and leisure services
2.9.6
Implementation (On time)
Marketing of sustainable mobility to residents
2.9.7
Continuous
Marketing of sustainable mobility to workplaces
2.9.8
Planning (On time)
Staff commuting
2.9.9
Completed
Flexible working practices
2.9.10
Implementation (On time)
Sustainable mobility in day-care centre transport
2.9.11
Completed
Sustainable mobility in school transport
2.9.12
Completed
Encouraging sustainable mobility in school transport and a renewed transport park
2.9.13
Implementation (On time)
Promoting cycling among students
2.9.14
Implementation (On time)
Encouraging sustainable mobility at Tredu
2.9.15
Implementation (On time)
Promoting sustainable mobility in subsidiaries
2.10.1
Planning (On time)
Holding competitive tendering for transport and work machinery
2.10.2
Completed
Emission categories for equipment procurement
2.10.3
Completed
Procurement plan for transport equipment, machinery and works contracts
2.10.4
Implementation (On time)
Modernity of vehicle and machine fleet at Tredu
2.10.5
Implementation (On time)
Reducing carbon dioxide emissions from Tampere Water’s vehicle fleet
2.10.6
Planning (On time)
Procurement plan for vans owned by city
2.10.7
Developing waste transport
2.10.8
Implementation (On time)
Waste collection vehicles will switch to using biogas or other low-emission propulsion options
2.10.9
Implementation (On time)
Low-emission maintenance
2.10.10
Implementation (On time)
Low-emission machinery will be deployed in maintenance and construction
3.
Sustainable construction
3.1.1
Completed
Carbon footprint of service facility network
3.1.2
Completed
Use data for service facility network
3.1.3
Not started (On time)
Preparation of a guide to promote circular economy in city’s construction projects
3.1.4
Implementation (On time)
Joint use of facilities
3.1.5
Implementation (On time)
Carbon footprint of construction projects
3.1.6
Implementation (On time)
Carbon footprint calculation for construction projects
3.1.7
Completed
Promoting climate neutrality of rental housing communities
3.1.8
Implementation (On time)
Preparing for climate change at city properties
3.1.9
Implementation (On time)
Implementation of RTS environmental classification will be piloted
3.1.10
Implementation (On time)
Promotion of wood construction
3.1.11
Calculation of life-cycle carbon footprint of new construction
3.1.12
Implementation of RTS environmental classification will be piloted
3.2.1
Implementation (On time)
The functionality, usability and reliability of building automation systems will be at a good level and will continue to…
3.2.2
Completed
Procurement of emission-free electricity and district heating
3.2.3
Continuous
Improvement of energy efficiency of service buildings
3.2.4
Completed
Solar window films will be installed on the windows at Tietotalo to reduce energy consumption
3.2.5
Completed
The heat system of the Ikuri sports hall will be replaced in 2022, the Linnainmaa well-being centre in 2023 and Tammelak…
3.2.6
Completed
The façade windows at the Hepolamminkatu 10 building will be replaced
3.2.7
Completed
The Metsätie building will undergo a local ventilation system renovation
3.2.8
Completed
Energy-saving projects for school buildings
3.2.9
Implementation (On time)
Smart heating control will be increased (according to the weather forecast, etc.)
3.2.10
Completed
Property management reporting
3.2.11
Completed
Sustainable development certificate of Tredu OKKA Foundation
3.2.12
Implementation (On time)
Construction of the City Hall
3.3.1
Implementation (On time)
Design guideline for low-carbon construction
3.3.2
Planning (On time)
Low-carbon building materials and products.
3.3.3
Planning (On time)
Holding competitive tendering for consultants and contractors
3.3.4
Planning (On time)
Framework agreements for master and architectural design
3.3.5
Not started (On time)
Life-cycle carbon footprint of construction projects
3.3.6
Implementation (On time)
Target price calculation
3.3.7
Planning (On time)
Utilisation of data models (BIM)
3.3.8
Implementation (On time)
Emission-free construction sites, operations in accordance with the requirements of the Green Deal
3.4.1
Planning (On time)
Carbon footprint calculation will be made part of the land allocation process for corporate-form residential buildings
3.4.2
Implementation (On time)
Housing and land policy guidelines will be updated on the basis of impact assessments
3.4.3
Implementation (On time)
Energy efficiency of house builders
3.4.4
Implementation (On time)
Zero and plus energy construction
3.4.5
Completed
A communication campaign for housing companies will be organised to encourage complementary construction
3.4.6
Implementation (On time)
Plot application programming
3.4.7
Continuous
Energy counselling for housing companies and residents
3.4.8
Implementation (On time)
Promotion of wood construction
3.5.1
Not started
Carbon footprint of infrastructure construction
3.5.2
Planning (On time)
Low-emission materials in infrastructure construction
3.5.3
Implementation (On time)
Use and recycling of soil masses
3.5.4
Implementation (On time)
Soil information platform
3.5.5
Not started
Intermediate storage of soil materials
3.5.6
Continuous
Utilisation of natural landscapes
3.5.7
Completed
Optimisation of road maintenance
3.5.8
Not started (On time)
Use of low-carbon concrete in station centre will be explored
3.5.9
Completed
Environmental tool for facility construction investments
3.5.10
Implementation (On time)
Material balance planning and soil monitoring tool
3.5.11
Implementation (Late)
Carbon footprint calculation of plant design projects
3.5.12
Implementation (Late)
Network investments in Tampere Water
3.5.13
Continuous
Sustainable environmental construction
3.5.14
Completed
Calculation of carbon effects
3.5.15
Not started (On time)
Infrastructure construction in Viinikanlahti and solutions for contaminated soil will aim for minimal transport needs
3.6.1
Implementation (On time)
Utilising recyclable materials
3.6.2
Planning (On time)
Improving the recycling rate of materials from demolition sites.
3.6.3
Completed
A study will be carried out on the utilisation of the side aggregate produced in Teisko
3.6.4
Implementation (On time)
Use of recycled materials in private construction
3.6.5
Not started
Circular economy centres of Rusko and Kolmenkulma
3.6.6
Implementation (On time)
Recycling of surplus materials and supplies
3.6.7
Planning (On time)
Use of recycled materials in Viinikanlahti
3.6.8
Implementation (On time)
Carbon footprint of public areas
4.
Sustainable energy
4.1.1
Completed
The Naistenlahti 2 Power Plant Unit will be replaced (2020-22)
4.1.2
Planning (On time)
The technology at geothermal installations will be developed in cooperation with other actors
4.1.3
Continuous
Energy efficiency of Waste-to-Energy Plant
4.1.4
Planning (On time)
The Lielahti Natural Gas Power Plant will be shut down
4.1.5
Planning (On time)
Some of the city’s properties will be connected to the district cooling network, where necessary, following expansion of…
4.1.6
Implementation (On time)
Tampereen Energia will promote the introduction of non-combustion and carbon negative district heat in Tampere
4.1.7
Continuous
Finnpark’s renewable energy
4.1.8
Pirkanmaan Jätehuolto Oy will switch to using sustainably produced and low-emission energy
4.1.9
Utilisation of district cooling in Tietotalo heating
4.1.10
Implementation (On time)
Execution of the sludge treatment and biogas plant
4.1.11
Completed
Koukkujärvi Biogas Plant
4.1.12
Developing the operations of the biogas plant
4.2.1
Completed
Demand response and energy-saving services
4.2.2
Completed
Introduction of a district heat battery in Tampere will be investigated
4.2.3
Planning (On time)
Smart grid and virtual power plant technologies will be developed and piloted
4.2.4
Implementation (On time)
LED street lighting
4.3.1
Continuous
Decentralised energy systems
4.3.2
Implementation (On time)
Solar panels and air-to-water heat pumps of buildings
4.3.3
Implementation (On time)
Energy-efficient heating systems for corporate properties
4.3.4
Completed
Tampereen Energia will promote the expansion of solar energy
4.3.5
Completed
The energy efficiency of air conditioning will be stepped up at Hämeenpuisto
4.3.6
Solar power plants for corporate properties
4.3.7
Electrical energy will be switched from fossil energy to renewable energy
4.3.8
Implementation (On time)
More energy-efficient lighting in companies
4.3.9
Completed
A land use review of Tampere’s green transition will be carried out
4.3.10
Completed
Tredu-Kiinteistöt Oy will procure solar power plants for the following sites
4.3.11
Planning (On time)
Hiedanranta’s energy system and life-cycle carbon footprint
4.3.12
Not started (Late)
Carbon neutral district heating in Särkänniemi
4.3.13
Not started (On time)
The production of decentralised renewable energy and energy efficiency will be promoted in the design of buildings in th…
4.3.14
Implementation (On time)
The regional energy efficiency systems and alternative energy production opportunities of the Viinikanlahti plans
4.3.15
Implementation
Meals for children and young people will be prepared in an energy-efficient manner at the Voimian Pata production kitche…
4.3.16
Implementation (On time)
Optimisation of wastewater pumping stations’ operations.
4.3.17
Implementation (On time)
Energy-efficiency measures in subsidiaries
4.3.18
Development of carbon capture
4.3.19
Not started (On time)
Leakage inspections in the wastewater network
4.3.20
Implementation (On time)
Network renovations to be carried out every year
4.3.21
Planning (On time)
Opportunities for increased energy recycling and storage will be mapped
4.3.22
Implementation (On time)
Calculation of the total consumption of comparable items
4.4.1
Continuous
Residential areas with oil heating will be identified in order to be able to more effectively encourage and guide people…
4.4.2
Implementation (Late)
Oil heating will be phased out in the city’s own buildings by 2025
5.
Sustainable consumption
5.1.1
Completed
Update of waste management regulations
5.1.2
Completed
Recycling of biowaste
5.1.3
Completed
Waste fees
5.1.4
Planning (On time)
The potential and impact of introducing a fee that encourages sorting will be investigated
5.1.5
Continuous
Life-cycle assessment of waste management services
5.1.6
Implementation (On time)
Waste management of city properties
5.1.7
Continuous
Improving recycling potential in upper secondary school buildings
5.1.8
Continuous
Placement of recycling containers in compliance with the amendments of the new waste legislation
5.1.9
Implementation (On time)
Waste management in land use planning
5.1.10
Implementation (On time)
The city’s construction sites will organise the separate collection of waste by waste type while avoiding the generation…
5.1.11
Planning (On time)
Organisation of waste management in densely built urban area
5.1.12
Completed
Circular economy of sanitation and food production
5.1.13
Implementation (On time)
Reception of precipitation sludge and sealed tank sludge
5.1.14
Planning (On time)
Shutdown of Viinikanlahti and Rahola wastewater treatment plants
5.1.15
Completed
Optimisation of precipitation chemical feed at wastewater treatment plants
5.1.16
More efficient nutrient cycle
5.1.17
Promotion of the recycling of plastic material
5.1.18
Completed
More efficient collection of plastic waste and biowaste at all schools
5.1.19
Not started (On time)
Reducing Tredu’s carbon footprint by reducing waste
5.1.20
Improving sorting possibilities in apartments
5.2.1
Supporting residents’ voluntary climate work
5.2.2
Implementation (On time)
Sustainable development campaigns
5.2.3
Completed
A natural management guide for residents will be compiled
5.2.4
Implementation (On time)
Residents' understanding and know-how of climate change mitigation and climate change adaptation will be improved
5.2.5
Upper secondary schools will pay attention to energy saving in everyday life, especially with regard to digital devices
5.2.6
Completed
Särkänniemi will digitize its management of chemicals
5.2.7
The new Tampere City Central Office Building will enable sustainable everyday working life for employees
5.2.8
Implementation (On time)
Properties’ stakeholders active training
5.2.9
Planning (On time)
Consumption data of the service facility network
5.2.10
Not started (On time)
Monitoring of electricity and water consumption
5.2.11
Implementation (On time)
The monitoring of the production of solar panels and the share of their use in the info-TV of sites or other easily acce…
5.2.12
Implementation
Sustainability objectives will be included in the criteria for partnership agreements for cultural spaces
5.2.13
Implementation
The reuse of exhibition structures will be enhanced in museums wherever possible
5.2.14
Planning
International sustainable development work will be participated in
5.2.15
Equipment management system in Sports and Exercise Services
5.2.16
Completed
The circular economy as an employer
5.2.17
Implementation (On time)
Promotion of shared use in Tredu
5.2.18
Not started (On time)
Sustainability of teaching materials at Tredu
5.2.19
Completed
Sustainable development scanning will be implemented in libraries
5.2.20
Implementation (On time)
Digital services in the city’s services will be developed in cooperation with service areas.
5.2.21
Completed
Digital tools for remote work
5.2.22
Implementation
Reducing the use of paper
5.2.23
Implementation (On time)
The old documentation needed in processes will be digitalised
5.2.24
Planning (On time)
Tredu's ICT devices have defined life cycles and will go for further use or to manufacturers for the manufacture of new …
5.3.1
Implementation (On time)
Education path for sustainability
5.3.2
Implementation (On time)
A sustainable future in early childhood education and pre-primary education
5.3.3
Implementation (On time)
Ecosocial education will create a framework for teaching in early childhood education and pre-primary education
5.3.4
Ecosocial education will create a framework for teaching sustainable development in basic education
5.3.5
Completed
Cycling education
5.3.6
Completed
Ecosocial education communications
5.3.7
Implementation (On time)
Sustainable summer jobs in youth services
5.3.8
Completed
Environmental professorship
5.3.9
Climate and environmental competence in upper secondary schools
5.3.10
Implementation (On time)
Tampere Vocational College will create sustainable management and a sustainable operating culture at Tredu
5.3.11
Implementation (Cancelled or postponed)
Promotion of ecosocial education through culture
5.4.1
Implementation (On time)
Voimia head for climate neutrality
5.4.2
Implementation (On time)
Voimia reduces food waste
5.4.3
Completed
Introduction of Hävikkimestari application
5.4.4
Continuous
Carbon footprint of catering
5.4.5
Continuous
The city’s hospitality functions will favour locally sourced food
5.4.6
Continuous
Catering of Culture and Leisure Services
5.4.7
Completed
Food policies
5.4.8
Completed
City residents’ understanding of the sustainable food system will be increased
5.4.9
Completed
Addition of edible plants
5.4.10
Continuous
Establishment of school gardens
5.4.11
Implementation (On time)
Raising young people with responsible eating habits
5.4.12
Not started (On time)
Reducing the amount of meat protein on menus
5.4.13
Implementation (On time)
Reducing food waste
5.4.14
Implementation (On time)
Making vegetarian food attractive
5.5.1
Completed
Digitalisation, such as electronic ticketing and service products, as well as the streamlining of internal processes, w…
5.5.2
Implementation (On time)
Sustainable events
5.5.3
Completed
Public transport tickets for events
5.5.4
Completed
Särkänniemi will introduce a joint ticket with Nysse
5.5.5
Implementation (On time)
Minimising the climate impact of Visit Tampere’s operations
5.5.6
Implementation (On time)
Promotion of climate neutral tourism business operations
5.5.7
Planning (On time)
Promoting tourists' sustainable mobility
5.5.8
Tampereen Messu- ja Urheilukeskus will adopt a certified environmental system by 2025
5.5.9
Planning (Late)
Särkänniemi will revamp its CO2 calculation
5.5.10
Implementation (On time)
Development of local tourism services that leave a positive nature handprint
5.5.11
Implementation (On time)
Increasing local tourism in which people get from one place to another using their own muscles
5.5.12
Implementation (On time)
Year-round nature services
5.5.13
Implementation (On time)
Development and establishment of express shuttle bus services
6.
Sustainable urban nature
6.1.1
Implementation (On time)
Management and use of city-owned forests will strengthen carbon sinks
6.1.2
Implementation (On time)
Strengthening of carbon sinks in city green
6.1.3
Strengthening of soil carbon sinks
6.1.4
Implementation (On time)
Adding biochar to substrate to act as a carbon sink and to improve water management
6.1.5
Implementation (On time)
The calculation and reporting of carbon sinks will be developed in each council period while carrying out carbon footpri…
6.1.6
Completed
i-Tree project
6.1.7
Continuous
Increasing carbon sequestration in parks
6.2.1
Continuous
Forests’ ability to adapt to climate change will be strengthened by diversifying the species and age structure of trees
6.2.2
Not started
Green area programme will be updated
6.2.3
Implementation (On time)
Tools to guide the design of a green structure that adapts to climate change will be developed
6.2.4
Implementation (On time)
A green-roof policy will be implemented
6.2.5
The tree variety experiment project will be looking for completely novel tree species
6.2.6
Continuous
A stormwater programme will be implemented
6.2.7
The operation of the City of Tampere’s stormwater network will be modelled
6.2.8
Planning (On time)
In connection with the updating of building regulations, a building code will be prepared containing construction instr…
6.2.9
Planning (On time)
Hiedanranta stormwater solutions
6.3.1
Implementation of the canopy cover of streams and ecological paths to be marked in the master plan
6.3.2
Implementation (Late)
Steps will be taken to prepare the protection of the sites set out in the nature conservation programme
6.3.3
Green areas are added to the school yards of upper secondary schools by, for example, establishing meadows and planting …
6.3.4
Urban trees will be added
6.3.5
Planning
Green areas will be added to the Särkänniemi area