Skip to main content

2.5.8Winter maintenance of cycling and walking routes

Progress

On time
  • Not started
  • Idea
  • Planning
  • Implementation
  • Completed

Official name

Winter maintenance of cycling and walking routes. The level of winter maintenance will be enhanced route-specifically along the main cycling routes and on the pedestrian routes in city centres and in regional centres by introducing new maintenance methods through pilots and by developing cooperation. The potential for utilising the IOT platform will be investigated. Tampereen Infra will develop a resource management system to determine the utilisation rates of work machinery and to optimise the routes of travel of work machinery.
(According to the Climate Neutral Tampere 2030-roadmap)

Summary and contacts

Timeline

Timeframe between 2025 - 2029

Mitigation, adaptation and circular economy

  • Cost estimate ranges for the period 2024-2030

    virkatyötä tai < 0,1 milj. €
Information updated 04/09/2025