3.5.1Carbon footprint of infrastructure construction

Progress

  • Not started
  • Idea
  • Planning
  • Implementation
  • Completed

Official name

Comprehensive emission calculation is used in IHKU. A plan for how the results of the emission calculation will be utilised in the development of operations and in the reduction of emissions will be drawn up.
(According to the Climate Neutral Tampere 2030-roadmap)

Tasks

What's left to do?

  • Todo12/31/2024

    The use of ecological compensation will be piloted, for example in large infrastructure projects.

  • Todo12/31/2024

    The life-cycle assessment will be tested in 1–2 projects and suitable projects will be designated. The results of life-cycle assessment projects will be utilised in operations.

Summary and contacts

Timeline

Timeframe between 2021 - 2026

Mitigation, adaptation and circular economy

  • Cost estimate ranges for the period 2024-2030

    0,1–1 milj. €