Skip to main content
Tampere's climate and environmental watch
Climate
LUMO
Tampereen luonnon monimuotoisuusohjelma
en
Suomi
English
Home
Theme
Climate leadership and stakeholder collaboration
Sustainable urban planning
Sustainable mobility
Sustainable construction
Sustainable energy
Sustainable consumption
Sustainable urban nature
All measures
Indicators
Information about the service
Search
en
Suomi
English
2024
All versions
2024
2022
Emission scenarios
Loading...
Loading...
Loading...
Loading
Organizations
Competence and Real Estate Services
/
Real Estate and Housing Policy
Climate (2024)
Climate Neutral Tampere 2030
Ilmasto (2022)
[2022 version] Hiilineutraali Tampere 2030
LUMO
Tampereen luonnon monimuotoisuusohjelma
Responsible in 66 actions
ID
Action title
Implementation phase
Status
Responsible parties
Information updated
0.1.10
A plan will be established to offset the emissions that cannot be reduced by 2030
Planning
On time
3 months ago
0.2.3
Ecosystem services and ecosystem accounting
Implementation
On time
3 months ago
0.2.6
CO2 emissions from the building stock
Implementation
On time
4 months ago
1.1.3
Development of the assessment of the climate impact of the urban structure
Implementation
On time
3 months ago
1.2.1
Land use policies
Implementation
On time
3 months ago
1.2.2
Guiding the local detailed planning
Planning
On time
3 months ago
1.2.11
Marketing of complementary construction sites in the city centre
Completed
4 months ago
1.2.12
Sustainable design competitions
Implementation
On time
3 months ago
1.3.3
Accessibility of services through sustainable modes of mobility
Continuous
4 months ago
1.3.7
Implementation of canopy coverage of indicative recreation connections
Implementation
On time
4 months ago
1.4.3
Increasing and development of blue-green infrastructure in city green development areas
Planning
On time
3 months ago
2.5.6
Bicycle parking at service properties
Implementation
On time
3 months ago
2.5.7
Development of bicycle parking spaces at the city’s properties
Planning
On time
3 months ago
2.6.1
Electric car charging network
Planning
On time
4 months ago
2.6.2
Electric car charging stations in the city’s new construction and renovation projects
Implementation
On time
3 months ago
2.8.3
Port charging points and availability of biofuels
Not started
4 months ago
3.1.1
Carbon footprint of service facility network
Completed
3 months ago
3.1.2
Use data for service facility network
Completed
3 months ago
3.1.3
Preparation of a guide to promote circular economy in city’s construction projects
Not started
On time
3 months ago
3.1.4
Joint use of facilities
Implementation
On time
3 months ago
3.1.5
Carbon footprint of construction projects
Implementation
On time
3 months ago
3.1.6
Carbon footprint calculation for construction projects
Implementation
On time
4 months ago
3.1.8
Preparing for climate change at city properties
Implementation
On time
3 months ago
3.1.9
Implementation of RTS environmental classification will be piloted
Implementation
On time
3 months ago
3.1.10
Promotion of wood construction
Implementation
On time
3 months ago
3.2.1
The functionality, usability and reliability of building automation systems will be at a good level and will continue to be developed
Implementation
On time
3 months ago
3.2.2
Procurement of emission-free electricity and district heating
Completed
On time
4 months ago
3.2.3
Improvement of energy efficiency of service buildings
Continuous
On time
4 months ago
3.2.8
Energy-saving projects for school buildings
Completed
On time
3 months ago
3.2.10
Property management reporting
Completed
3 months ago
3.3.1
Design guideline for low-carbon construction
Implementation
On time
3 months ago
3.3.2
Low-carbon building materials and products.
Planning
On time
3 months ago
3.3.3
Holding competitive tendering for consultants and contractors
Planning
On time
3 months ago
3.3.4
Framework agreements for master and architectural design
Planning
On time
3 months ago
3.3.5
Life-cycle carbon footprint of construction projects
Not started
On time
3 months ago
3.3.6
Target price calculation
Implementation
On time
3 months ago
3.3.7
Utilisation of data models (BIM)
Planning
On time
4 months ago
3.3.8
Emission-free construction sites, operations in accordance with the requirements of the Green Deal
Implementation
On time
3 months ago
3.4.1
Carbon footprint calculation will be made part of the land allocation process for corporate-form residential buildings
Planning
On time
3 months ago
3.4.2
Housing and land policy guidelines will be updated on the basis of impact assessments
Implementation
On time
3 months ago
3.4.3
Energy efficiency of house builders
Implementation
On time
3 months ago
3.4.4
Zero and plus energy construction
Implementation
On time
3 months ago
3.4.5
A communication campaign for housing companies will be organised to encourage complementary construction
Completed
On time
4 months ago
3.4.6
Plot application programming
Implementation
On time
3 months ago
3.4.8
Promotion of wood construction
Implementation
On time
3 months ago
3.5.5
Intermediate storage of soil materials
Not started
4 months ago
3.5.10
Material balance planning and soil monitoring tool
Implementation
On time
4 months ago
3.6.2
Improving the recycling rate of materials from demolition sites.
Planning
On time
3 months ago
3.6.4
Use of recycled materials in private construction
Implementation
On time
3 months ago
4.1.5
Some of the city’s properties will be connected to the district cooling network, where necessary, following expansion of the district cooling network
Planning
On time
3 months ago
4.3.1
Decentralised energy systems
Continuous
On time
4 months ago
4.3.2
Solar panels and air-to-water heat pumps of buildings
Implementation
On time
3 months ago
4.3.21
Opportunities for increased energy recycling and storage will be mapped
Planning
On time
4 months ago
4.3.22
Calculation of the total consumption of comparable items
Implementation
On time
4 months ago
4.4.2
Oil heating will be phased out in the city’s own buildings by 2025
Implementation
Late
3 months ago
5.1.6
Waste management of city properties
Implementation
On time
3 months ago
5.2.8
Properties’ stakeholders active training
Implementation
On time
4 months ago
5.2.9
Consumption data of the service facility network
Planning
On time
4 months ago
5.5.12
Year-round nature services
Implementation
On time
4 months ago
6.1.1
Management and use of city-owned forests will strengthen carbon sinks
Implementation
On time
3 months ago
6.1.2
Strengthening of carbon sinks in city green
Implementation
On time
3 months ago
6.1.5
The calculation and reporting of carbon sinks will be developed in each council period while carrying out carbon footprint assessment
Implementation
On time
3 months ago
6.2.1
Forests’ ability to adapt to climate change will be strengthened by diversifying the species and age structure of trees
Continuous
4 months ago
6.2.4
A green-roof policy will be implemented
Implementation
On time
4 months ago
6.3.1
Implementation of the canopy cover of streams and ecological paths to be marked in the master plan
4 months ago
6.3.3
Green areas are added to the school yards of upper secondary schools by, for example, establishing meadows and planting trees with the students
4 months ago