Skip to main content
Tampere's climate and environmental watch
Climate
LUMO
Tampereen luonnon monimuotoisuusohjelma
en
Suomi
English
Home
Theme
Climate leadership and stakeholder collaboration
Sustainable urban planning
Sustainable mobility
Sustainable construction
Sustainable energy
Sustainable consumption
Sustainable urban nature
All measures
Indicators
Information about the service
Search
en
Suomi
English
2024
All versions
2024
2022
Emission scenarios
Loading...
Loading...
Loading...
Loading
Organizations
Urban Environment Planning
/
Green Areas and Stormwater Management
Climate (2024)
Climate Neutral Tampere 2030
Ilmasto (2022)
[2022 version] Hiilineutraali Tampere 2030
LUMO
Tampereen luonnon monimuotoisuusohjelma
Responsible in 38 actions
ID
Action title
Implementation phase
Status
Responsible parties
Information updated
0.1.10
A plan will be established to offset the emissions that cannot be reduced by 2030
Planning
On time
viisi kuukautta sitten
0.2.3
Ecosystem services and ecosystem accounting
Implementation
On time
kuukausi sitten
0.3.2
Corporate cooperation
Not started
viisi kuukautta sitten
1.1.6
Maintenance and development of operating environment information
Implementation
Late
20 päivää sitten
1.1.8
Climate change adaptation in the urban structure
Continuous
20 päivää sitten
1.2.12
Sustainable design competitions
Implementation
On time
18 päivää sitten
1.2.13
Space reservations for adaptation structures
Implementation
On time
18 päivää sitten
1.2.14
Snow space guidelines
Completed
viisi kuukautta sitten
1.3.3
Accessibility of services through sustainable modes of mobility
Continuous
20 päivää sitten
1.3.4
Accessibility of local services
Implementation
On time
18 päivää sitten
1.3.7
Implementation of canopy coverage of indicative recreation connections
Implementation
On time
20 päivää sitten
1.3.12
Development of railway station area
Planning
On time
16 päivää sitten
1.3.13
Digital urban space manual
Completed
16 päivää sitten
1.4.1
Cohesion of green areas
Continuous
On time
17 päivää sitten
1.4.2
A green factor will be introduced into and used in the appropriate detailed plans
Continuous
On time
18 päivää sitten
1.4.3
Increasing and development of blue-green infrastructure in city green development areas
Planning
On time
viisi kuukautta sitten
1.4.4
Participation in the development of the blue-green infrastructure planning tool and its introduction
Implementation
On time
17 päivää sitten
1.4.5
Defining the principles of securing the blue-green infrastructure in the growth and vitality zone
Planning
On time
17 päivää sitten
1.4.8
Green roofs in urban development projects of the city centre
Planning
On time
16 päivää sitten
3.5.13
Sustainable environmental construction
Continuous
viisi kuukautta sitten
3.5.14
Calculation of carbon effects
Completed
viisi kuukautta sitten
5.1.11
Organisation of waste management in densely built urban area
Planning
On time
25 päivää sitten
5.2.3
A natural management guide for residents will be compiled
Completed
viisi kuukautta sitten
5.4.9
Addition of edible plants
Completed
viisi kuukautta sitten
6.1.2
Strengthening of carbon sinks in city green
Implementation
On time
viisi kuukautta sitten
6.1.3
Strengthening of soil carbon sinks
viisi kuukautta sitten
6.1.4
Adding biochar to substrate to act as a carbon sink and to improve water management
Implementation
On time
viisi kuukautta sitten
6.1.6
i-Tree project
Completed
viisi kuukautta sitten
6.1.7
Increasing carbon sequestration in parks
Continuous
viisi kuukautta sitten
6.2.2
Green area programme will be updated
Not started
viisi kuukautta sitten
6.2.3
Tools to guide the design of a green structure that adapts to climate change will be developed
Implementation
On time
viisi kuukautta sitten
6.2.4
A green-roof policy will be implemented
Implementation
On time
kuukausi sitten
6.2.5
The tree variety experiment project will be looking for completely novel tree species
viisi kuukautta sitten
6.2.6
A stormwater programme will be implemented
Continuous
viisi kuukautta sitten
6.2.7
The operation of the City of Tampere’s stormwater network will be modelled
viisi kuukautta sitten
6.2.8
In connection with the updating of building regulations, a building code will be prepared containing construction instructions for the stormwater systems of buildings
Planning
On time
viisi kuukautta sitten
6.3.1
Implementation of the canopy cover of streams and ecological paths to be marked in the master plan
viisi kuukautta sitten
6.3.4
Urban trees will be added
viisi kuukautta sitten